+43 42 77 200 35 institut@umh.at

After the installation of the UMH unit, the chlorine consumption has been reduced by approx. 30 %. Three weeks after the installation of the 2″ UMH unit, the lime deposits from the last few years also came out of the pipes, so that the complete residues collected in front of the screens. This was convincing for everyone.